LEA 400 kV SC LESCKOVAC-BORDER FYROM
The project was funded by the European Agency for Reconstruction in order to improve the power system in southern Serbia, overloaded with up to 15%, as well as creating a connection point with the transmission network of Macedonia and Greece.
ELM Electromontaj Cluj carried out within the project - 100 km of line, the works consisting of: execution of foundations, assembly and raising of poles, installation of insulation, installation of active and protective conductors, installation of optical fiber.
An average number of 7 builders participated in the realization of the project to carry out clearing works, foundations, raising poles, painters and line equipment.
The 400 kV line, single circuit, stretches 73 km to the Macedonian border, comprising 225 poles and equipped with 2 ACSR 490/65 mm conductors per phase2.