The teams of ELM Electromontaj Cluj participated in the renovation of the SEINE AVAL Treatment Plant, a historical site for treating waste water in Paris, the plant being the largest and most modern treatment plant in Europe.
ELM Electromontaj Cluj carried out the wiring, connection, verification and commissioning of the power and automation systems.
Among the works performed by our colleagues are the following:
– sleeving the new 20 kV cables with the old 20 kV ones to complete the medium voltage loops in the new 20 kV– 140 MW connection station;
- implementation of the lighting system in all processing units;
– connecting the engines that actuate the turbo blowers to the 6 kV network and their integration into the general automation system;
- execution of electrical connections in the 0.4 kV power and automation cabinets;
– connecting and plugging motors related to pumps and related sensors;
– connecting hundreds of actuators and process sensors.