The connection to the SEN of the Sarichioi - Tulcea Wind Power Plants
The project consisted in the construction of an overhead power line (LEA) with a length of 15 km, between the power station of the Sarichioi wind farm and the connection point to the SEN located on the route of the 110 kV overhead power line between Zebil and Tulcea Vest and the construction of the power station 110/33kV which was connected to LEA 110 kV Zebil – Tulcea Vest through an overhead electrical connection.
Total installed power: 30 MW
Connection station – Zebil Nord 110 kV
12 km LEA 110 kV
12 km OPGW
Connection to the Electric Transmission and Distribution Network