Connection to the system – CEN Baia (LEA 110kV, LES 110kV and optical fiber installation)
The project involved the design, manufacture, supply, testing, packaging, transport, delivery to the site of supplies and equipment, as well as the execution of the 110 kV LEA and 110 kV LES for the connection of the Baia wind power plant to the 110/20 kV Baia station.
The assembly construction works carried out within the work are: execution of foundations, installation of poles and brackets, chains of insulators, grounding installations, installation of junction box, installation of optical fiber, installation of terminal boxes.